Case Study 1: NYLACAST LTD

 

Nylacast bought their first Maylan Pallet Change System a Model 600 in 1996.

Due to increased throughput targets achieved since introduction

Nylacast have since purchased a further eight Maylan Pallet Masters.

Reduction in floor to floor times of 50%

 

Components per Cycle 6

Component Weight 0.5Kg each

Fixture Weight 2Kg

Total Weight 5Kg

Material Plastic

Original Load/Unload time- 1 minute

New Load/Unload time with Pallet System fitted- 10 seconds

Original floor to floor time for 6 parts- 10 minutes

New floor to floor time with Pallet System fitted- 5 minutes

Original change over time between jobs- 30 minutes

New changeover time with Pallet System fitted- 15 minutes

To view Photos please click on the links below:

PHOTO 1

PHOTO 2

PHOTO 3