CNC Direct purchased a Maylan Twin Pallet Change System,

this proved so successful they have bought another four at various times since.

Thanks to the use of Maylan Pallet Change Systems in machining medium to large batch quantities of castings

CNC Direct have achieved a 22% increase in output.

Furthermore, load and unload times have shrunk from 10 minutes to just 10 seconds,

coupled with reduced change over times between jobs.

Reduction in floor to floor times of 22%

 

Components per Cycle 6

Component Weight 2 Kg each

Fixture Weight 10 Kg

Total Weight 22 Kg

Material Cast Iron

Original Load/Unload time- 10 minutes

.New Load/Unload time with Pallet System fitted- 10 seconds

Original floor to floor time for 6 parts- 19 minutes

New floor to floor time with Pallet System fitted- 15 minutes

Original changeover time between jobs- 25 minutes

New changeover time with Pallet System fitted- 9 minutes